Analysis of Influential Factors of Material
Management in Selected Hydropower Projects in
Koshi Province, Nepal
Student: Puskar Shrestha
Supervisor: Dr. Dinesh Sukamani
Submitted Date:
August, 2024
Abstract
Effective material management plays a crucial role for the success of the project in
general and particular for hydropower projects which by virtue located in challenging
location in terms of supply and delivery of material in bulk volume every time. In the context
of Nepal, material management in construction of hydropower project is one of the major
concerns. As of FY 2022/23 a total installed capacity of 3,718 MW are under construction
stage with estimated cost of about NPR. 750 billion. Considering 60% to 70% of direct cost
of construction of hydropower projects, construction materials accounts about NPR. 450 to
525 billion. Material represents a major expense in construction of hydropower projects but
it has been largely overlooked by researchers and academics in the context of Nepal's
hydropower sector.
To overcome the shortfall in material management issue, the main objective of this study
is to investigate the various influential factors of material management in construction of
hydropower projects in Koshi Province, Nepal based on the selected hydropower projects
under study. The study also identifies the status and challenges of the material management
practices in the industry along with the possible solutions to mitigate challenges encountered
in cost effective and efficient material management in Koshi Province for studied
hydropower projects and similar project reckonable to the projects under study. The study
adopts Structural Equation Modelling (SEM) using smart partial least square (PLS), which
is a statistical methodology that takes conformity approach to the analysis of a structural
theory bearing on some phenomenon. Similarly, Bloom's Cutoff, Principal Component
Analysis (PCA) have been carried out for data analysis. Bloom's Cutoff is statistical tool to
categorize the data into different levels and PCA is a dimensionality reduction technique to
simplify large datasets by transforming them into a set of orthogonal variables. Key
Informant Interviews (KII) was conducted for thematic analysis.
The outcomes projected based on the detail study under the scope shows the importance
of material management during construction in the chronological order of "Planning",
"Management" and "Purchasing". Based on the questionnaire survey and checklist reveals
vii
the moderate level of practice in those hydropower projects under study in Koshi Province.
The findings show the "Poor Operational and Financial Management" as the most
significant challenges of overall material management.
Implementing advanced project management software, engaging skilled manpower and
establishing standardized procedure for inventory management and documentation are the
remedial measures for the effective material management practices, ultimately aiming to
enhance project productivity, reduce cost overruns, ensure minimum loss and wastage
during transportation and storage, and ensure timely project completion.
Keywords
Material management, influential factors, hydropower project, Koshi
Province, structural equation modelling, effective and efficient material management